The rating recognizes large scale project’s commitment to sustainability at the design stage. By assessing architectural plans and environmental performance analyses, project teams demonstrate their commitment to create a campus that minimizes the environmental impact and contributes to the development of a low-carbon habitat.
Introduction
Intent
The intent of the rating is to encourage project teams to integrate sustainability principles at the planning and design stage and enabling towards self-sufficiency of large-scale developments by evaluating the masterplan design of the project at early stage.
Salient Features
Leads projects towards self-sufficiency
The rating drives the large-scale projects towards self-sufficiency for energy, water and waste.
Checklist-Based Compliance Structure
Functions as a guiding checklist for design and execution teams to ensure systematic adherence to the rating requirements throughout project development.
Design Optimization Mechanism
Facilitates early identification of design interventions and technical improvements required to enhance sustainability outcomes before project execution.
Simulation-Driven Efficiency
Utilizes advanced modelling and simulations to predict and optimize resource consumption at the inception of the project.
Benefits/Advantages of adopting GRIHA LD Masterplan Rating
Early Acknowledgment of Sustainability Commitment
Masterplan rating provides official recognition to projects that demonstrate a proactive commitment to sustainable design and construction practices.
Informed Project Planning and Decision-Making
The process helps project teams integrate energy efficiency, water conservation and waste management strategies early, leading to better coordination and informed decision-making.
Alignment with LD phase-wise Certification
By identifying potential gaps and providing corrective feedback early in the design stage, masterplan rating streamlines the pathway toward achieving final rating.
Integrated Approach
The masterplan rating process fosters collaboration among architects, engineers, sustainability consultants, and clients, ensuring a cohesive and holistic approach to sustainable campus design.
Eligibility & Virtual Boundary
Required Criterion
GRIHA LD:
Projects with site area greater than or equal to 50 hectares (125 acres) are eligible for GRIHA LD rating.
LD: Masterplan Rating:
Projects with site area greater than or equal to 50 hectares (125 acres) are eligible for GRIHA LD rating.
Rating Fees
Fee Summary
INR 3.25 lakh (Fee USD - 4500$)
Notes:
This is non-refundable and needs to be paid upfront on registration of the project for GRIHA rating.
The fee includes:
- GRIHA Council costs for preliminary assessment, administration, co-ordination of online documentation submission, and support over the project duration.
- One-day training workshop for project teams.
- Third party evaluator fees.
GRIHA LD Masterplan Rating Thresholds
| Sub-sections | Overall Weights (A) | Maximum Sub-section Score (B) | Weighted Score ( C) = (A) X (B) |
|---|---|---|---|
| Self-Sufficiency Appraisals | |||
| Energy | 0.18 | 100 | 18 |
| Water | 0.23 | 100 | 23 |
| Organic solid waste treatment | 0.12 | 100 | 12 |
| Development Quality | |||
| Site Planning | 0.08 | 100 | 8 |
| Energy | 0.09 | 100 | 9 |
| Water | 0.12 | 100 | 12 |
| Solid Waste Management | 0.06 | 100 | 6 |
| Transport | 0.06 | 100 | 6 |
| Social | 0.06 | 100 | 6 |
| Total Score | 1 | 100 | |
Fast-Track Process
| GRIHA Process - Normal vs Fast Track | ||
|---|---|---|
| Review Stage | Normal Review Timeline | Fast Track Review timeline |
| Review of 1st Submission | Within 45-50 working days | Within 20-25 working days |
| Final Review | Done within 25-30 working days after receipt of 2nd documentation | Will be done within 15-20 working days after receipt of 2nd documentation |