GRIHA LD Masterplan Rating

Introduction

 
 

The rating recognizes large scale project’s commitment to sustainability at the design stage. By assessing architectural plans and environmental performance analyses, project teams demonstrate their commitment to create a campus that minimizes the environmental impact and contributes to the development of a low-carbon habitat.

Intent

 
 

The intent of the rating is to encourage project teams to integrate sustainability principles at the planning and design stage and enabling towards self-sufficiency of large-scale developments by evaluating the masterplan design of the project at early stage.

Salient Features

1
2
3
4

Leads projects towards self-sufficiency

The rating drives the large-scale projects towards self-sufficiency for energy, water and waste.

Checklist-Based Compliance Structure

Functions as a guiding checklist for design and execution teams to ensure systematic adherence to the rating requirements throughout project development.

Design Optimization Mechanism

Facilitates early identification of design interventions and technical improvements required to enhance sustainability outcomes before project execution.

Simulation-Driven Efficiency

Utilizes advanced modelling and simulations to predict and optimize resource consumption at the inception of the project. 

Benefits/Advantages of adopting GRIHA LD Masterplan Rating

⚡

Early Acknowledgment of Sustainability Commitment

Masterplan rating provides official recognition to projects that demonstrate a proactive commitment to sustainable design and construction practices.

💧

Informed Project Planning and Decision-Making

The process helps project teams integrate energy efficiency, water conservation and waste management strategies early, leading to better coordination and informed decision-making.

♻️

Alignment with LD phase-wise Certification

By identifying potential gaps and providing corrective feedback early in the design stage, masterplan rating streamlines the pathway toward achieving final rating.

🌍

Integrated Approach

The masterplan rating process fosters collaboration among architects, engineers, sustainability consultants, and clients, ensuring a cohesive and holistic approach to sustainable campus design.

Eligibility & Virtual Boundary

Project Boundary
Virtual Boundary
grihald-rating.png
Click to zoom

Required Criterion

GRIHA LD:

Projects with site area greater than or equal to 50 hectares (125 acres) are eligible for GRIHA LD rating.

LD: Masterplan Rating:

Projects with site area greater than or equal to 50 hectares (125 acres) are eligible for GRIHA LD rating.

Rating Fees

Fee Summary

INR 3.25 lakh (Fee USD - 4500$)

Notes:

This is non-refundable and needs to be paid upfront on registration of the project for GRIHA rating.

The fee includes:

  • GRIHA Council costs for preliminary assessment, administration, co-ordination of online documentation submission, and support over the project duration.
  • One-day training workshop for project teams.
  • Third party evaluator fees.

GRIHA LD Masterplan Rating Process

Design Stage
Construction Stage
Post Completional/Operational Stage
Certification Stage
1

Registration

2

Submission of documentation

3

Preliminary Evaluation

4

Submission of final documentation

5

Final Evaluation

6

Award of Rating

GRIHA LD Masterplan Rating Thresholds

Sub-sectionsOverall Weights (A)Maximum Sub-section Score (B)Weighted Score ( C) = (A) X (B)
Self-Sufficiency Appraisals
Energy0.1810018
Water0.2310023
Organic solid waste treatment0.1210012
Development Quality
Site Planning0.081008
Energy0.091009
Water0.1210012
Solid Waste Management0.061006
Transport0.061006
Social0.061006
Total Score1 100
Percentile Threshold
Achievable Star Rating
25-40
⭐
41-55
⭐ ⭐
56-70
⭐ ⭐ ⭐
71-85
⭐ ⭐ ⭐ ⭐
86 and more
⭐ ⭐ ⭐ ⭐ ⭐

Fast-Track Process

GRIHA Process - Normal vs Fast Track
Review StageNormal Review TimelineFast Track Review timeline
Review of 1st SubmissionWithin 45-50 working daysWithin 20-25 working days
Final ReviewDone within 25-30 working days after receipt of 2nd documentationWill be done within 15-20 working days after receipt of 2nd documentation

Notes

  • Fast track review fees will be over and above the fee already paid by the project team towards registration and certification.
  • GRIHA Council reserves the right to accept the fast-track review request for any project.
  • Incomplete submission will impact review timelines.
  • GRIHA Council has a strict ‘Zero-Tolerance Policy’ towards credibility and transparency, while evaluating documents for the award of ratings. Therefore, it advises all project teams/clients to refrain from undue representations of information/documentsto avoid any conflict and maintain trust and credibility.
Register Now

Section Weightages

Grand Total
100
Points